accounting

Audit Workpaper Index and Tick Marks Explained

How an audit workpaper index template works, how to reference schedules, and how to build and document a tick mark legend. Conventions differ between firms, so define your own.

Alok K Acharya & Associates
12 November 2026·Updated 12 November 20268 min read
Need Professional Assistance?Explore our related service offering

Audit Workpaper Index and Tick Marks Explained#

An audit workpaper index is the map of a file: a list of every schedule with a reference, so a reader can find any figure and follow it back to its support. Tick marks are the small symbols beside figures that say what was done to each number. People searching for "audit workpaper tick marks" or an "audit workpaper index template" usually want one thing: a layout they can copy and a legend they can trust.

One honest caveat first. There is no single universal set of tick marks and no single indexing scheme. Firms differ, and so do their software and templates. This article shows common patterns, framed as examples. Your own firm's methodology and template always take precedence. See also our overview of remote audit support.

What the workpaper index does#

The index is usually the first page of the file. It lists each workpaper, its reference, a title, and often who prepared it and who reviewed it. Its job is navigation and completeness: if a schedule is not on the index, a reviewer may never find it, and if an index line points to nothing, something is missing.

Index elementPurpose
ReferenceUnique code for the workpaper
TitleWhat the schedule is, in plain words
AreaThe financial statement area it supports
Prepared by / dateLeft for the preparer to complete
Reviewed by / dateLeft blank for your team
StatusDraft, ready for review, reviewed
Open pointsPointer to the open-items list

The review fields stay blank on anything we prepare. Review and sign-off belong to your engagement team.

Referencing: the common patterns#

A reference is just a code. Practice varies, so the patterns below are examples only.

  • Letter by area. A letter or letter-number for each area, with sequence numbers inside it. For example, all cash schedules start with one letter and are numbered in order.
  • Number by area. The same idea with numeric sections.
  • Software-generated. Some audit tools assign references automatically, and the scheme follows the tool.

Whatever the scheme, three habits matter more than the scheme itself:

  1. Every reference is unique.
  2. The lead schedule for an area comes first within its group, with supporting schedules after it.
  3. The same reference is used everywhere the schedule is mentioned: index, lead schedule, trial balance mapping and the request list.

Cross-referencing#

Cross-referencing links figures between pages. A figure on the lead schedule carries the reference of the schedule that supports it. On the supporting schedule, the same figure carries the reference back to the lead. A reader should be able to move in both directions.

An illustrative extract of a lead schedule with a reference column:

AccountRefPer trial balancePer scheduleDifference
Operating accountC-138,50038,5000
Savings accountC-320,15020,1500
Petty cashC-42502500

The codes C-1, C-3 and C-4 are illustrative. The lead schedule walkthrough shows the full layout and how a reference column is reviewed. The same codes should appear on the request list, in the "used in" column. The PBC list walkthrough covers that link.

What tick marks are#

A tick mark is a symbol written beside a figure, with a key at the bottom of the page or at the front of the file, stating what was done. The point is to turn a page of numbers into a page where each number says how it was checked, so a reviewer does not have to ask.

A tick mark records an action that has actually been done. It is not decoration, and a symbol applied without the work is worse than no symbol. If a figure has no mark, the reader should be able to assume nothing was done to it.

An example legend#

The legend below is a sample only. These are patterns that appear in many files, not a standard. Firms assign symbols differently, and the same symbol can mean different things in two files.

Symbol (example)Example meaningWhat it should point to
TickAgreed to source documentDocument reference
Tick with a circleAgreed to bank statementStatement and date
Cross-hatchAgreed to prior-year filePrior-year reference
FFooted (column added again)None needed
CFCross-footed (rows added again)None needed
TBAgreed to trial balanceTrial balance version and date
Letter in a boxAgreed to the schedule with that codeWorkpaper reference
Query markDifference or question, see open itemsOpen-items number

Treat the left column as placeholders. Replace each with the symbol your firm uses, and keep the meaning column specific.

Two cautions. First, do not let one symbol cover two different actions, such as "agreed to invoice" and "agreed to payment". If two checks were done, two marks are needed. Second, a legend that says only "checked" or "reviewed" without saying against what is not really a legend.

Where to define the legend#

Practice differs, and either of these is acceptable if used consistently:

  • A single legend page near the front of the file, covering all schedules.
  • A short key on each schedule, listing only the symbols used on that page.

Some teams do both: a master legend and a repeated key on pages that use many symbols. If you work in a spreadsheet, a key at the bottom of the sheet is safer than a separate page, since pages get separated when printed or exported.

When a remote team prepares schedules, send the legend with the first schedule. Do not leave the team to infer it from a finished example.

A worked example#

An illustrative bank section, with the sample legend applied. All numbers are illustrative.

LineAmountMarks
Balance per bank statement41,000Agreed to statement
Outstanding payments(3,200)Agreed to subsequent clearing
Deposit in transit700Agreed to subsequent clearing
Adjusted bank balance38,500F
Balance per ledger38,500TB
Difference0

Each mark tells the reader what was done. The reader does not need to guess whether the 38,500 was compared with the ledger or merely copied from it.

Marking what was not done#

A good habit that many files lack: mark the open points as clearly as the completed ones. A figure that could not be agreed gets the query mark and an entry on the open-items list with the reason. For example: "invoice not provided", "statement shows a different date", "balance per ledger changed after the schedule was built". The mark is a pointer; the explanation lives in the list.

Documenting conventions for a handover#

If the file will be worked on by more than one person, or by a team outside your office, a one-page convention note prevents a lot of rework. It can include:

  • Reference scheme, with a worked example.
  • The legend of tick marks and what each should point to.
  • Colour or font conventions for inputs, formulas and notes, if any.
  • File naming and versioning rules.
  • Where open items are recorded.
  • Which fields the preparer completes and which are left for the reviewer.

Keep it to one page. A long manual is rarely read.

Common problems#

ProblemWhy it happensPrevention
Symbols with no keyKey was on another page or lostPut the key on the sheet
One symbol, two meaningsShortcuts under time pressureAdd a symbol
Marks added without the workPressure to finishMarks only for completed actions
Duplicate referencesTwo people numbering independentlyOne person owns the index
Index out of dateSchedules added laterUpdate the index before return
Mark with no sourceReader cannot traceAdd the document reference

What to send us#

  • Your workpaper index template, or a completed example from a prior year.
  • Your tick mark legend, or a note that we should propose one for your approval.
  • The reference scheme, with an example.
  • Your request list and trial balance mapping.

What comes back#

  • Schedules in your template with your references applied.
  • A completed index with preparer fields filled and reviewer fields left blank.
  • Marks only for actions actually performed, with sources noted.
  • An open-items list for your team.

Frequently asked questions#

Is there a standard set of audit workpaper tick marks? No single standard exists. Many files use similar patterns, such as a mark for agreed to source or footed, but firms assign their own symbols. Always define the legend in the file.

What is the difference between footing and cross-footing? Footing re-adds a column of figures to confirm the total. Cross-footing re-adds across a row. Both are arithmetic checks and say nothing about whether the figures themselves are right.

Where should the legend go? Either on one page near the front or as a short key on each schedule, depending on your firm's practice. For spreadsheets, a key on the sheet itself travels better.

Does the remote team tick and sign off the workpapers? We apply marks only for work we have done, such as agreeing a figure to a document or footing a column. Review marks, sign-off and conclusions stay with your engagement team.

Where to go next#

Read the lead schedule walkthrough to see references in use, and the PBC list walkthrough for the request side. A schedule that applies these conventions is shown in the fixed asset rollforward. The full scope is set out under audit support and workpaper preparation.

Need Help With Your Tax Filing?

The firm can help you file your ITR accurately, review applicable deductions, and ensure compliance. Get started in minutes.

Was this article helpful?

Alok K Acharya & Associates

Alok K Acharya & Associates

Chartered Accountants

Chartered Accountants

Related Articles

Need CA help?

Talk to the firm

Get Started